Energy monitoring across 10+ industrial plants
How a custom-built data acquisition and PES tracking platform protected a plant's annual CAR qualification (~90 GWh in primary energy savings) and supports a portfolio of 50,000 TEE/year (581 GWh) in White Certificates (TEE).
The context
An Italian energy-engineering consultancy, based in the province of Bologna, manages High-Efficiency Cogeneration (CAR) and White Certificate (TEE — Titoli di Efficienza Energetica) processes for its industrial clients: titles issued by the GSE that reward verified primary energy savings measured in toe (tonnes of oil equivalent) compared with separate electricity and heat production.
Each TEE equals one toe of primary energy saved, and one title is issued for every toe saved. That is why the portfolio relying on the platform —50,000 TEE per year— equals 581 GWh of primary energy saved annually.
The operation covers more than 10 industrial plants (primarily paper mills and packaging facilities operating gas turbines and heat-recovery steam generators totalling over 100 MW). Each plant generates continuous readings of electricity generation, natural gas intake (turbine and post-firing) and useful thermal energy that must be collected, validated and turned into auditable KPIs.
The problem
Earning White Certificates depends on proving to the GSE that the facility meets CAR requirements across the calendar year: keeping overall efficiency above the regulatory threshold (75–80%) and maintaining a Primary Energy Saving index (PES) ≥ 10%, while properly deducting non-cogenerative post-firing heat.
Furthermore, GSE rules do not allow missing meter readings to be reconstructed from historical estimates: if a fiscal meter or steam totaliser fails, or if the PES index drops below threshold without timely detection, the affected period is penalised and thousands of TEEs (tens of GWh in certified savings) are lost. Previous monitoring was scattered across separate systems, with manual validation and limited visibility between reviews.
The solution
I designed and built a custom energy monitoring platform, end to end:
- Acquisition pipelines that automatically collect electricity, natural gas and steam data across more than 10 plants.
- Meter and totaliser validation at the source, so a faulty sensor neither contaminates KPIs nor invalidates GSE reporting periods.
- Daily calculation of thermodynamic and regulatory KPIs per plant (overall efficiency, PES index, primary energy savings RISP and post-firing deductions).
- Early alerts when the PES index or thermal performance deviates from High-Efficiency Cogeneration (CAR) thresholds.
- Automated technical reporting for audits and annual White Certificate (TEE) applications.
The results
In the first year, the platform detected a performance anomaly and PES index drift early enough to correct plant operation before it compromised the facility's annual White Certificates.
Energy volume of the White Certificate (TEE) portfolio whose verification processes now rely on the platform: each TEE certifies one toe of primary energy saved, so 50,000 TEE equal 581 GWh per year — roughly 60 million Sm³ of natural gas saved compared with separate production.
Gas turbines and heat-recovery steam generators continuously monitored (~80,000 operating hours/year), with operational KPIs per plant.
From field data receipt to an operational diagnosis with clear priorities whenever a deviation occurs.
The stack is not the point: the system turned an invisible risk into a KPI watched every day. If the value of your operation depends on data that is reviewed late or by hand today, it is worth a look together.